Draft for review — copy and figures pending verification
An Open Petition · Bloomfield, Connecticut
An open petition to the White House & federal leadership

One official closed our bakery.For 365 days.

No peer review. No panel. Just one signature — and in Connecticut, the same official has kept the business across our street closed for three years.

Signatures are delivered to the White House, the SBA National Ombudsman, and Connecticut legislators.

Illustration of a closed storefront with a red closure placard on the door
95 Granby St · Bloomfield, CT → Illustration placeholder
365Days closed
10Plan revisions
1Official's signature
3yrsThe business next door
30Day statutory window ignored
The Story

A bakery, a permit, and a year of closed doors.

Our bakery at 95 Granby Street in Bloomfield, Connecticut was an existing commercial business. What we needed was routine permitting. What we received was an administrative loop with no exit.

The demands shifted. Inspections arrived unannounced. Statutory 30-day review windows passed — repeatedly — without a decision. And through all of it, the placard stayed on our door.

“One official became investigator, judge, and executioner over a small business's survival.”

Three licensed professionals — an architect, a structural engineer, and an HVAC specialist — withdrew from our project. We asked each for written reasons. We received none.

Across the street, another business has been closed by the same official for more than three years. We do not speak for its owner.

Read the full case file →

From 95 Granby St.

Recorded outside our locked doors.

Recorded at 95 Granby St., Bloomfield, CT. Transcript available on request
The Record

Ten revisions. Three hundred sixty-five days.

A five-point summary. The full log, with document numbers and hearing dates, is on the record page.

Day 0

Permit application filed

Routine application for an existing commercial bakery at 95 Granby St. All required documents submitted.

Application no. [PLACEHOLDER]
Day 34

First review returned — after the statutory window

Three comments issued. Under CGS § 29-263, the review window is 30 days.

Statutory window exceeded
Day 61

Revisions requested — again

New comments added that were not part of the original review.

Revision 2 of 10
Day 210

Property placarded and closed

Business closed by order of a single building official. No panel review. No administrative hold hearing scheduled.

Single-official closure
Day 365

Still closed

One year. Doors locked. Ten revisions on record. A state hearing notice is pending.

Pending
Open the full record →
The Act

Three safeguards. One law.

Provision 01Review

Mandatory multi-person review panels

No single official may issue a commercial shutdown or deny a Certificate of Occupancy. Any hold exceeding 30 days must be ratified by a three-person panel.

Who sitsBuilding official · independent licensed state reviewer · commercial ombudsman.
Provision 02Deadlines

Strict enforcement of statutory review windows

Miss the state deadline without a documented safety justification and an expedited state-level or third-party review triggers automatically — paid for by the municipality.

CitationCGS § 29-263 · 30-day review window.
Provision 03Protection

Protection against administrative retaliation

Safe-harbor channels for business owners and licensed professionals to report selective enforcement and delay tactics without fear of commercial retaliation.

Why it mattersThree professionals left our project. None would put their reasons in writing.
Read the proposed legislative text →
Sign

Add your name to the record.

Small business owners are not asking for exemptions from life-safety codes. We are asking for predictability, equal treatment, and due process — before a business is closed, not after.

0signatures

Goal 10,000 · figures updated manually

Petition hosted on Change.org

Sign the petition to reform permitting laws

Delivered to →
The White House
SBA National Ombudsman
Connecticut General Assembly
Sign on Change.org →

You will be taken to Change.org to add your name. Your email is never shown publicly.

Voices

We are not the only ones.

“Quotes from affected business owners go here — short, specific, and attributable.”

Business owner · Connecticut

“A licensed professional on the review process, in their own words.”

Licensed architect

“Or an advocate, a legislator, or a neighbor — pending written consent.”

Placeholder
Press

Documents, images, and a fact sheet.

Everything a reporter needs, in one place. High-resolution images, the full record, and a one-page summary.

Questions

Straight answers.

Is this a campaign against one person?

No. It is a campaign against a structure that gives one person final authority over a business's survival. The act is named after the official because the pattern — not the personality — is what needs a name.

Are you asking for weaker safety codes?

No. Life-safety codes are not in question. We are asking for review by more than one person, and for deadlines that existing law already sets.

What does multi-person review actually change?

It removes the single point of failure. A closure that lasts more than 30 days would require ratification by a building official, an independent licensed reviewer, and a neutral ombudsman.

Who is behind this petition?

The owners of the business at 95 Granby Street, Bloomfield, Connecticut. Contact details and a full disclosure are on the legal page.

Have these allegations been adjudicated?

No. They describe our own documented experience. A state hearing is pending. We publish the official's right of reply in full.

All questions →