The full account

What happened at 95 Granby Street.

An existing commercial bakery. A routine permit. Ten revisions, a statutory deadline that passed eleven times, and one official's signature that kept our doors locked for a year.

Note on this account

This page sets out our own experience and our own records. Where a date, document number, or name is marked [PLACEHOLDER], the supporting document has not yet been added to the public file. Every claim here is either drawn from a document we hold or attributed to us as our account.

01 · The business

Our bakery operated at 95 Granby Street in Bloomfield, Connecticut. It was not a new venture requesting a change of use in a residential zone. It was an existing commercial bakery inside a commercial property, seeking the permits required to keep operating and to make the improvements the town asked for.

We had employees. We had equipment. We had a lease. What we did not have, for more than a year, was a decision.

02 · The application

The application was filed on [DATE] under application number [NUMBER]. The submission included the drawings and technical documents the town's own checklist required.

Under Connecticut law, a building official has a defined window to act. In our case the statutory window is 30 days under CGS § 29-263. The first response did not arrive within it.

Exhibit AApplication & submission receipt

Placeholder for the scanned application, the stamped submission receipt, and the town's review checklist. Redactions: personal contact details only.

03 · The loop

Over the following year, the plan set came back ten times. Some comments were substantive and we addressed them. Others arrived late, replaced earlier comments, or concerned matters that had already been reviewed and approved.

Each cycle cost us money: redrawn sheets, engineering stamps, resubmission fees, and another month of rent with no revenue. Each cycle also reset the clock on a decision we were legally entitled to.

From the review correspondence
Round 1  — [date] — 3 comments
Round 2  — [date] — comments added after prior approval
…
Round 10 — [date] — [summary]

We are not arguing that every comment was improper. We are arguing that ten rounds, spread across a year, with no oversight and no deadline, is a structure that can end any small business — and that structure is what this petition asks to change.

04 · The deadline

CGS § 29-263 sets a 30-day window for review. It was exceeded on [NUMBER] occasions in our file. No penalty followed. No expedited review was triggered. No supervisor was required to sign off on the delay.

This is the second safeguard we ask for: if a municipality misses its own statutory deadline without a documented safety justification, an expedited state-level or third-party review should start automatically — paid for by the municipality, not by the business waiting.

05 · The closure

On [DATE], the property was placarded and our business was closed. The order came from a single building official. There was no panel vote, no peer review, and no scheduled administrative hearing before the closure took effect.

The closure lasted more than a full year. Our doors were locked. Our staff were laid off. Our equipment sat idle.

Exhibit BClosure placard & order

Placeholder for the photograph of the placard and the written closure order, including the issuing official's name, title, and date.

06 · The professionals

Three licensed professionals worked on our project: an architect, a structural engineer, and an HVAC specialist. All three withdrew before the project concluded.

We asked each of them, in writing, for the reason. None provided one in writing.

We do not claim to know their reasons, and we do not name them. We note only what is verifiable: three licensed professionals left a project that required their stamps to proceed, and the project could not proceed without them.

Why this matters for the law

When licensed professionals will not put a reason in writing, a business owner loses the ability to appeal — because there is no record to appeal. That is precisely what safeguard 03 addresses.

07 · Across the street

A second business on Granby Street has been closed for more than three years. It was closed by the same building official.

We do not speak for its owner, and we do not describe its circumstances. We note only the public fact of the closure and its duration, because a single closure can be explained as a dispute. Two, on the same street, under the same signature, raises a question about the structure of the authority itself.

08 · Why we named it

The act is named after Chief Building Official Dwight Carlson. We want to be precise about why.

Not because we believe one person is uniquely bad. Because the opposite: any person holding this combination of powers — to inspect, to judge, to close, and to extend indefinitely without review — can end a business. The name makes that structural problem specific and hard to ignore. It is also why we publish a full right of reply.

“The problem is not who holds the pen. The problem is that one pen is enough.”

09 · What we are asking for

Three changes, none of which weakens a single life-safety code:

  • Multi-person review before any commercial closure or Certificate of Occupancy denial exceeding 30 days.
  • Automatic enforcement of existing statutory review windows, with the cost of delay borne by the municipality.
  • Safe-harbor protection for business owners and licensed professionals who report selective enforcement.

Read the proposed legislative text →